Wednesday, December 10, 2008

On December 2008

To Do:
  1. Confirm Door Design - 1st Floor Children Room leading to Balcony. (Done 12/12/08)
  2. Confirm Door Design - Grd Floor Dinning Room leading to Garden. (Done 12/12/08)
  3. Confirm Door Design - Main Entrance. (Done 12/12/08)
  4. Confirm Toilet Design - Grd Floor Common.
  5. Confirm Toilet Design - 1st Floor Common.
  6. Confirm Toilet Design - 1st Floor Master.
  7. Confirm Mixer Tape Design.
  8. Confirm Shower Tape Design.
  9. Confirm Shower Room Design.
  10. Confirm Toilet Floor Design.

To Buy:
  1. Order more door frame. x2 SL x1 DL. (Done 12/12/08)
  2. Order Woodern Door. x1 DL. x5 SL.
  3. Order Aluminium Door. x2 SL. x1 Folding. (Done 12/12/08)
  4. Order Toilet Bowl. x3 Units. (Done 12/12/08)
  5. Order Basin Sink. x3 Units. (Done 12/12/08)
  6. Order Mixer Tape. x3 Units.
  7. Order Shower Tape. x3 Units.
  8. Order Shower Room.
  9. Order Toilet Floor Tiles.

Contractor Job List:
  1. Complete all plaster ceiling concealing job.
  2. Complete wall wire concealing job.
  3. Complete all windows frame skirting job.
  4. Complete all toilets piping job.