- Confirm Door Design - 1st Floor Children Room leading to Balcony. (Done 12/12/08)
- Confirm Door Design - Grd Floor Dinning Room leading to Garden. (Done 12/12/08)
- Confirm Door Design - Main Entrance. (Done 12/12/08)
- Confirm Toilet Design - Grd Floor Common.
- Confirm Toilet Design - 1st Floor Common.
- Confirm Toilet Design - 1st Floor Master.
- Confirm Mixer Tape Design.
- Confirm Shower Tape Design.
- Confirm Shower Room Design.
- Confirm Toilet Floor Design.
To Buy:
- Order more door frame. x2 SL x1 DL. (Done 12/12/08)
- Order Woodern Door. x1 DL. x5 SL.
- Order Aluminium Door. x2 SL. x1 Folding. (Done 12/12/08)
- Order Toilet Bowl. x3 Units. (Done 12/12/08)
- Order Basin Sink. x3 Units. (Done 12/12/08)
- Order Mixer Tape. x3 Units.
- Order Shower Tape. x3 Units.
- Order Shower Room.
- Order Toilet Floor Tiles.
Contractor Job List:
- Complete all plaster ceiling concealing job.
- Complete wall wire concealing job.
- Complete all windows frame skirting job.
- Complete all toilets piping job.